Neudietendorf–Ritschenhausen railway
Neudietendorf–Ritschenhausen | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Route number: | 570 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number: | 6298 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length: | 75 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum speed: | 160 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Neudietendorf–Ritschenhausen railway connects
History
The first ten kilometres of the Neudietendorf–Ritschenhausen line was built by the
The line quickly developed into a major north-south link, so that duplication between Neudietendorf and Grimmenthal was carried out between 1886 and 1893. Until the founding of the
After the
Between 2003 and 2008 the route was prepared for the use of tilting trains. The upgrade was completed for the December 2008 timetable change. It included, inter alia, the renovation of the Brandleite Tunnel, which had to be closed for nearly a year, and the installation of
Operations
Despite some operational problems, such as slopes with a maximum grade of 2.38 % in the Thuringian forest and the need to reverse trains running to
Passenger services
A fast train operated in the early 1890s from Berlin to Stuttgart via Erfurt, Meiningen and Schweinfurt. In 1914, there were three trains each day on this route, yet all ran via Meiningen, although they had to reverse there.
At its height in 1938 a daily pair of fast long-distance expresses (Fernschnellzug, FD-Zug, catering to first and second class passengers, but not third class passengers) and five pairs of ordinary expresses ran on the line, which ran on the Berlin–Erfurt–Schweinfurt–Würzburg–Stuttgart route. The FD 8 service included coaches that continued to
After the Second World War, the only long-distance trains operated via Erfurt and Suhl to and from Meiningen. Express trains ran to Berlin,
With
In the timetable of 2009, the Mainfranken-Thüringen-Express runs on the line every two hours as
Freight
After completion of the line in 1884 there was intensive freight traffic, consisting of both through traffic and local agricultural traffic. In addition to numerous local trains, there was, for example in 1939, 12 through freight trains in each direction daily and four trains for train loads of up to 1,200 tons. These were usually hauled up the steep grades by
Even after the Second World War, the track in Thuringia was used by eight daily general freight trains from Arnstadt to Grimmenthal and up to five trains carrying full-train loads for high volume traffic. They were typically hauled by
After the closing of the gap to the former West Germany after reunification, between 1991 and 1994 the line saw altered traffic flows and the last spike in freight traffic. Up to eight heavy freight trains ran daily on the north-south link. Since then freight trains run only when required, for example, freight trains to transport timber between Erfurt and Grimmenthal.
References
- Hommel, Detlef (1984) (in German). 100 Jahre Strecke Neudietendorf - Ritschenhausen. pp. 12–14.
- Thielman, Georg; Schmidt, Markus (1999) (in German). Von Erfurt nach Schweinfurt. Freiburg: EK-Verlag. ISBN 3-88255-441-X.
External links
- "Timetable for KBS 570" (in German). http://bahn.erfurter-bahn.de/index.php?STB4. Retrieved 1 March 2011.
- "Timetable for 1944 (p. 1)" (in German). http://pkjs.de/bahn/Kursbuch1944/Teil5/417.jpg. Retrieved 1 March 2011.
- "Timetable for 1944 (p. 2)" (in German). http://pkjs.de/bahn/Kursbuch1944/Teil5/417-2.jpg. Retrieved 1 March 2011.
- "Timetable for 1944 (p. 3)" (in German). http://pkjs.de/bahn/Kursbuch1944/Teil5/417-3.jpg. Retrieved 1 March 2011.
- "Neudietendorf-Ritschenhausen" (in German). http://www.klauserbeck.de/Strecken1/NeudietendorfRitschenhausen/NeudietendorfRitschenhausen.htm. Retrieved 1 March 2011.
- "Photographs of tunnel portals" (in German). Tunnelportale. http://www.eisenbahntunnel-portal.de/lb/inhalt/tunnelportale/6298.html. Retrieved 1 March 2011.
Retrieved from : http://en.wikipedia.org/wiki/Neudietendorf%E2%80%93Ritschenhausen_railway
No comments:
Post a Comment